• Cold Drawn Seamless Carbon Steel Honed Tubing for Hydraulic Cylinder
  • Cold Drawn Seamless Carbon Steel Honed Tubing for Hydraulic Cylinder
  • Cold Drawn Seamless Carbon Steel Honed Tubing for Hydraulic Cylinder
  • Cold Drawn Seamless Carbon Steel Honed Tubing for Hydraulic Cylinder
  • Cold Drawn Seamless Carbon Steel Honed Tubing for Hydraulic Cylinder
  • Cold Drawn Seamless Carbon Steel Honed Tubing for Hydraulic Cylinder

Cold Drawn Seamless Carbon Steel Honed Tubing for Hydraulic Cylinder

After-sales Service: Yes
Warranty: 6 Months
Type: Seamless
Technique: Cold Drawn
Material: Carbon Steel
Surface Treatment: Oiled
Samples:
US$ 200/Piece 1 Piece(Min.Order)
| Request Sample
Customization:

Contact Supplier

Mr. Chen Jianjun
Sales Representative
Diamond Member Since 2019

Suppliers with verified business licenses

Manufacturer/Factory

Basic Info.

Model NO.
CXHT-3
Usage
Hydraulic/Automobile Pipe, Machinery Industry, Mining, Special Purpose
Section Shape
Round
ID Tolerance
H8
Bore Treatment
Honing, Skiving&Roller Burnishing
Bore Roughness
Ra0.25um
Od Treatment
Machining+Polishing
Transport Package
Standard Export Packing or Customized Packing
Specification
40mm*30mm-580mm*500mm
Trademark
Chengxin, OEM
Origin
Jiangsu, China
HS Code
7304319000
Production Capacity
24000 Tons/Year

Product Description

PART I: PRODUCT INTRODUCTION
1. Description: 
Honed tube is a kind of smooth bore steel tube used to manufacture hydraulic cylinder barrels that is the core part of a piece of hydraulic cylinder. 
2. Commodity: Cold drawn seamless honed tubing for hydraulic cylinder
3. Size range: 40mm*30mm-580mm*500mm
4. Available steel grade: 
SAE/AISI:  SAE1020, SAE1026, SAE1045, SAE4130, SAE4140
DIN:  ST52, ST52.3, ST52.4
EN:  E355, C45E, 25CrMo4, 42CrMo4, CK45, S45C, E410, E470
GB:  20#, 45#, 16Mn, Q345B, Q345C, Q345D, Q345E, 25Mn, 27SiMn, 
5. Manufacture method: Cold rolled, hydraulic cold drawn, hot rolled+deep hole boring
6. Delivery condition: 
BK BKW BKS GBK NBK Q+T
+C +LC +SR +A +N
Cold rolled Cold drawn Stress relieved Annealed Normalized Quenched+Tempered
7. Bore treatment: Honing, skiving&roller burnishing
8. Bore roughness control: Ra0.25um max or Ra0, 35um max for honed tubes, Ra0.25um max for skived&roller burnished tubes. 
9. End finish: Plain ends with square cuts, free of burrs for honed tubes. Little bevelled ends for skived&roller burnished tubes. 
10. Standard export packing: In bundles tied with steel strips. Int&ext oil coating. End plastic caps. External packing by PVC bags and knit bags. 
11. Customized packing and marking can be provided upon request. 
12. H8 tolerance: 
ID range Tolerance ID range Tolerance
18< d ≤30 +0/+0.033 180< d ≤250 +0/+0.072
30< d ≤50 +0/+0.039 250< d ≤300 +0/+0.081
50< d ≤80 +0/+0.046 300< d ≤315 +0/+0.081
80< d ≤120 +0/+0.054 315< d ≤400 +0/+0.089
120< d ≤180 +0/+0.063 400< d ≤500 +0/+0.097
13. Difference between honed tube and skived&roller burnished tube: In hydraulic cylinder industry, there are 2 solutions for bore treatment: Honing, and skiving&roller burnishing. Honing or skiving&roller burnishing leads to different internal surface image, but both ensure good roughness. 

Cold Drawn Seamless Carbon Steel Honed Tubing for Hydraulic Cylinder
Cold Drawn Seamless Carbon Steel Honed Tubing for Hydraulic Cylinder

PART II: FREQUENTLY ASKED QUESTIONS
1. MOQ: 
Generally Min Order Quantity can be 2-3 tons/size for tubes with OD below 250mm, and 10 tons/size for tubes with OD above 250mm. Sometimes, it depends on steel grade you need. If you need special grade like E410, E470 or alloy steel tube, MOQ should be 10 tons/size at least. 
2. Delivery Time: Generally, our delivery time for honed tubes is around 40-60 days depending on the sizes and quantities. It will take us 15-30 days to get raw material. For example, if you need 3 tons of small size honed tubes 50mm*40mm with roughness of Ra0.25um max, it will take us at least 30 days to hone this size. 
3. Warranty&Guarantee: Warranty&guarantee period is 6 months since we deliver the tubes, and we are not responsible for quality problem caused by wrong unloading or storage after shipment. We welcome customer's inspection before shipment. 
4. Payment Method: We accept payment method like T/T, L/C, or D/P, but it depends on our investigation about customers. We have a solution to evaluate the credit of customers from all over the world, and time and amount of D/P we can release is determined by the evaluation. 

5. Quality Control: 90% of the tubes are made from hot rolled seamless pipes. So, quality of raw material determined quality of finished tubes. We purchase raw material from stable suppliers who are leading steel mills, and we inspect the raw material as per the specifications. During our production procedure, there is inspection and quality control in every stage. 

PART III: COMPANY INTRODUCTION
We are a manufacturer of cold drawn, cold rolled, and hydraulic cold drawn steel tubes with OD upto 356mm since 2002. Covering an area of about 32000M2, we have 12 standard workshops with 2 hydraulic cold drawing benches, 4 chain cold drawing benches, and 2 ERW mills. Our facilities covers all the production procedures from pickling, cold drawing, heat treating, saw cutting, straightening, inspection, packing to further machining &turning, cold drawing die fabrication, and equipment repairation&maintenance. 

FACTORY APPEARANCE:
Cold Drawn Seamless Carbon Steel Honed Tubing for Hydraulic Cylinder Cold Drawn Seamless Carbon Steel Honed Tubing for Hydraulic Cylinder Cold Drawn Seamless Carbon Steel Honed Tubing for Hydraulic Cylinder Cold Drawn Seamless Carbon Steel Honed Tubing for Hydraulic Cylinder Cold Drawn Seamless Carbon Steel Honed Tubing for Hydraulic Cylinder Cold Drawn Seamless Carbon Steel Honed Tubing for Hydraulic Cylinder



 

Send your message to this supplier

*From:
*To:
avatar Mr. Chen Jianjun
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now