• Customized Tube Parts
  • Customized Tube Parts
  • Customized Tube Parts
  • Customized Tube Parts
  • Customized Tube Parts
  • Customized Tube Parts

Customized Tube Parts

Type: Seamless
Technique: Hot Rolled
Material: Carbon Steel
Surface Treatment: Machining&Turning
Usage: Machinery Industry, Chemical Industry
Section Shape: Round
Customization:
Diamond Member Since 2019

Suppliers with verified business licenses

Manufacturer/Factory

Basic Info.

Model NO.
CXMP-1
Machining&Turning
as Per Request
Transport Package
Plywood Boxes
Specification
70-580mm
Trademark
OEM, Chengxin
Origin
Jiangsu, China
HS Code
84139100
Production Capacity
6000 Pieces/Year

Product Description

PART I: PRODUCT INTRODUCTION
1. Introduction: 
We can manufacture steel tubes and provide machining&turning service for the pipes&tubes as per your design and drawing.
2. Commodity: Customized tube parts
3. Size range: OD of 600mm max, wall thickness not limited. Length of 2800mm max.
4. Available steel grade: carbon steel, alloy steel, and stainless steel.
SAE/AISI: 1020,1026,1045,1518,1524,1541,4130,4140,4145,4340,8620
EN: E195,E235,E355,E470,C45E,25CrMo4,34CrMo4,42CrMo4,S355JR,S355J0H,S355J2H
DIN: ST35, ST45, ST52,ST52.3,ST52.4
JIS: STKM 13A, STKM 13C, STKM 16A,
5. Raw Material: Hot rolled seamless pipes, ERW steel tube, or cold drawn seamless tube or pipe. 
6. Machining&turning: as per drawing. 

DIFFERENT PARTS WE EVER MADE: 
Customized Tube Parts

Customized Tube Parts

Customized Tube Parts

Customized Tube Parts



PART II: FREQUENTLY ASKED QUESTIONS
1. MOQ: 
Generally Min Order Quantity can be 1 piece/size. 
2. Delivery Time: Generally, delivery time is around 40-60 days depending on availability of raw material.
3. Warranty&Guarantee: Warranty&guarantee period is 6 months since we deliver the tubes, and we are not responsible for quality problem caused by wrong unloading or storage after shipment. We welcome customer's inspection before shipment. 
4. Payment Method: We accept payment method like T/T, L/C, or D/P, but it depends on our investigation about customers. We have a solution to evaluate the credit of customers from all over the world, and time and amount of D/P we can release is determined by the evaluation. 
5. Quality Control: 90% of the tubes are made from hot rolled seamless pipes. So, quality of raw material determined quality of finished tubes. We purchase raw material from stable suppliers who are leading steel mills, and we inspect the raw material as per the specifications. During our production procedure, there is inspection and quality control in every stage.

PART III: FACTORY FACILITIES
Customized Tube Parts
Customized Tube Parts
Customized Tube Parts
Customized Tube Parts

Customized Tube Parts
Customized Tube Parts

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2019

Suppliers with verified business licenses

Manufacturer/Factory
Year of Establishment
2000-11-13
Management System Certification
ISO9001:2015