• En 10305-5 E195 E235 E355 Welded Carbon Steel Square Tube
  • En 10305-5 E195 E235 E355 Welded Carbon Steel Square Tube
  • En 10305-5 E195 E235 E355 Welded Carbon Steel Square Tube
  • En 10305-5 E195 E235 E355 Welded Carbon Steel Square Tube
  • En 10305-5 E195 E235 E355 Welded Carbon Steel Square Tube
  • En 10305-5 E195 E235 E355 Welded Carbon Steel Square Tube

En 10305-5 E195 E235 E355 Welded Carbon Steel Square Tube

Type: Welded
Technique: ERW
Material: Carbon Steel
Surface Treatment: Oiled
Usage: Pipeline Transport, Construction & Decoration, Special Purpose
Section Shape: Round
Customization:
Diamond Member Since 2019

Suppliers with verified business licenses

Manufacturer/Factory

Basic Info.

Model NO.
CXWT-2
Grade
Carbon Steel
Surface Condition
Black, Bright
Length
12000mm Max
Shape
Round, Rectangular, Square, Oval, Hexagonal
Transport Package
Seaworthy Export Packing
Specification
10mm*0.8mm-80mm*3mm
Trademark
OEM, Chengxin
Origin
Jiangsu, China
HS Code
73063090
Production Capacity
24000 Tons/Year

Product Description

PART I: PRODUCT INTRODUCTION
1. Commodity: EN 10305-5 welded square carbon steel tube
2. Size range: 10mm*10mm*1mm-60mm*60mm*3mm
3. Available steel grade: 
ASTM: MT1010, MT1020, 1010, 1020
DIN:  ST37, ST44, ST52
EN:  E195, E215,E235,E355, 
GB:  Q195, Q235,Q345
4. Manufacture method: ERW
5. Delivery condition: CR1,CR2, +A,+N
6. End finish: Plain ends with square cuts, free of burrs.
7. Standard export packing: In bundles tied with steel strips. Int&ext oil coating. End plastic caps. External packing by PVC bags and knit bags. 
8. Customized packing and marking can be provided upon request. 
En 10305-5 E195 E235 E355 Welded Carbon Steel Square Tube
En 10305-5 E195 E235 E355 Welded Carbon Steel Square Tube
En 10305-5 E195 E235 E355 Welded Carbon Steel Square Tube



PART II: FREQUENTLY ASKED QUESTIONS
1. MOQ:
3-5 tons/size
2. Delivery Time: 15-45 days depending on availability of raw material in stock.
3. Warranty&Guarantee: Warranty&guarantee period is 6 months since we deliver the tubes, and we are not responsible for quality problem caused by wrong unloading or storage after shipment. We welcome customer's inspection before shipment. 
4. Payment Method: We accept payment method like T/T, L/C, or D/P, but it depends on our investigation about customers. We have a solution to evaluate the credit of customers from all over the world, and time and amount of D/P we can release is determined by the evaluation. 
5. Quality Control: We purchase raw material from stable suppliers who are leading steel mills, and we inspect the raw material as per the specifications. During our production procedure, there is inspection and quality control in every stage. 

PART III: COMPANY INTRODUCTION
We are a manufacturer of cold drawn, cold rolled, and hydraulic cold drawn steel tubes with OD upto 356mm since 2002. Covering an area of about 32000M2, we have 12 standard workshops with 2 hydraulic cold drawing benches, 4 chain cold drawing benches, and 2 ERW mills. Our facilities covers all the production procedures from pickling, cold drawing, heat treating, saw cutting, straightening, inspection, packing to further machining &turning, cold drawing die fabrication, and equipment repairation&maintenance. 

FACTORY APPEARANCE:
En 10305-5 E195 E235 E355 Welded Carbon Steel Square Tube

ERW WORKSHOP:
En 10305-5 E195 E235 E355 Welded Carbon Steel Square Tube

ERW ASSEMBLY LINE:
En 10305-5 E195 E235 E355 Welded Carbon Steel Square Tube

ERW ASSEMBLY LINE:
En 10305-5 E195 E235 E355 Welded Carbon Steel Square Tube

MAINTENANCE&REPAIR WORKSHOP: 
En 10305-5 E195 E235 E355 Welded Carbon Steel Square Tube

ERW MODULE WAREHOUSE: 
En 10305-5 E195 E235 E355 Welded Carbon Steel Square Tube
En 10305-5 E195 E235 E355 Welded Carbon Steel Square Tube





 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2019

Suppliers with verified business licenses

Manufacturer/Factory
Year of Establishment
2000-11-13
Management System Certification
ISO9001:2015